Handling ceramic pipes in high-temperature areas

GÜDEL product
Process type
Work piece
Industry
Handling ceramic pipes in high-temperature areas

Loading a blast furnace and stacking ceramic pipes along a travel length of approx. 23 m.
Workpiece weight approx. 70 kg
Workpiece dimensions approx. Ø 250 x 1800 mm

Read more ...

Palleting hard metal indexable inserts

GÜDEL product
Process type
Work piece
Industry
Palleting hard metal indexable inserts

Palleting up to 20,000 randomly placed indexable inserts in a very small area as well as workpiece-aligned loading and unloading of a Junker grinding machine.
Cycle time: 20 sec.
Workpiece exchange time in the machine: 4.0 sec.
Workpiece weight: approx. 0.03 kg – 0.20 kg
Workpiece dimensions: approx. Ø 5.0 mm - Ø 25.0 mm to approx. 10.0 mm – 35.0 mm

Read more ...

Loading and unloading a grinding machine

GÜDEL product
Process type
Work piece
Industry
Loading and unloading a grinding machine

Loading and unloading a grinding machine with an integrated dual-axis system and workpiece storage in a disc-type magazine.
Shaft parts of various sizes must be removed from the disc-type magazine by means of a robot system and handed over by handshake through a loading hatch on the side of the interior dual-axis portal.
Cycle time: 12 sec.
Workpiece exchange time: 4.0 sec.
Workpiece weight: max. 5.0 kg
Workpiece dimensions: Shaft parts up to a max. Read more ...

Handling ceramic pipes in high-temperature environments

GÜDEL product
Process type
Work piece
Industry
Handling ceramic pipes in high-temperature environments

Loading a blast furnace and stacking ceramic pipes over a travel distance of approx. 20 m. The extremely tight space does not permit a solution with a floor-based travel axis, which was possible with the two previously supplied sister systems.
Workpiece weight approx. 70 kg
Workpiece dimensions approx. Ø 250 x 1800 mm

Read more ...

Robotic Transfer for 3,000 Ton Press

GÜDEL product
Process type
Work piece
Industry
Robotic Transfer for 3,000 Ton Press

Automate the de-stacking, loading, unloading, and restacking of Frame Rails through bend, pierce, and form operations.
(4) Operators were manually running production on a 91 kg 5.3 meter frame rail. This part had to be run three times through a press to get the bend, pierce and form operation. Each batch had to be de-stacked, loaded/unloaded through a press and restacked or loaded into a rack.

Read more ...

Handling train wheels for a lathe cell #3

GÜDEL product
Process type
Work piece
Industry
Handling train wheels for a lathe cell #3

In the factory of a Russian end customer, unfinished train wheels must be removed from the stack and deposited in one of the four vertical lathes in the lathe cell. There are 2 cells with 4 vertical lathes each. A low shop crane limits the height of the portal. Moreover, the wheels are stacked six high and held in place by means of a centering mandrel in the middle. Because of the centering mandrel, the gripper must be arranged at an angle in order to be able to reach the Read more ...

Part loading on Mazak Lathes

GÜDEL product
Process type
Work piece
Industry
Part loading on Mazak Lathes

The main task was to run the Mazak lathe cell for one hour without supervision (operator). This allows machines to continue druing work interruptions
Machine cycle time 17 sec.
Part weight 1 kg max.

Read more ...

Cylinder Heads Handling

GÜDEL product
Process type
Work piece
Industry
Cylinder Heads Handling

Loading and unloading of various machine tools in a versatile production.
The objective was line cycle times of 23 seconds and maximum machine idle times (parts exchange through portal) of 15 seconds. Various fastening scenarios were required for various workpiece types.
Automotive-level user friendliness and safety requirements.

Read more ...

Handling of Clutch Housings

GÜDEL product
Process type
Work piece
Industry
Handling of Clutch Housings

Loading and unloading of various machine tools in a versatile production environment. The objective was line cycle times of 18 seconds and maximum machine idle times (parts exchange through portal) of 15 seconds. Various fastening scenarios were required for various workpiece types. Automotive-level user friendliness and safety requirements. The customer?s space is limited.

Read more ...